FLOGEN Logo
In Honor of Nobel Laureate Dr. Avram Hershko
SIPS 2024 logo
SIPS 2024 takes place from October 20 - 24, 2024 at the Out of the Blue Resort in Crete, Greece

Honoree Banner
PROGRAM NOW AVAILABLE - CLICK HERE

More than 500 abstracts submitted from over 50 countries


Featuring many Nobel Laureates and other Distinguished Guests

ADVANCED PROGRAM

Orals | Summit Plenaries | Round Tables | Posters | Authors Index


Click here to download a file of the displayed program

Oral Presentations


SESSION:
ConstructionTuePM4-R10
9th International Symposium on Sustainable Construction Materials
Tue. 22 Oct. 2024 / Room: Dazzle D.
Session Chairs: Harn Wei Kua; Ahsen Maqsoom, Prof.; Student Monitors: TBA

17:50: [ConstructionTuePM414] OS
BIM THE GAME-CHANGER FOR SAFER CONSTRUCTION: IDENTIFYING RISKS, FIRE WEAK SPOTS AND OPTIMIZING CONSTRUCTABILITY
Usman Ali1; Ahsen Maqsoom, Prof.2; Bashar Ul Asad3; Muhammad Irfan3
1Department of Management Sciences, COMSATS University Islamabad Wah Campus, Wah Cantt, Pakistan; 2University Mohammed VI Polytechnic, Benguerir, Morocco; 3Civil Engineering Department, COMSATS University Islamabad Wah Campus, Wah Cantt, Pakistan
Paper ID: 214 [Abstract]

Worker’s safety hazards results in substantial number of accidents including injuries and fatalities at the construction projects. This case study aims to apply Building Information Modeling (BIM) principles to optimize workers' safety during the design phase of a high-rise residential building. The study objective is to develop a BIM model and analyze it against construction safety hazards in order to identify risks, fire weak spots, remove structural clashes and optimize the constructability. The research methodology involved preparing a BIM model using AUTODESK Revit and analyzing it with Solibri Model Checker and IFC based fire safety analysis using Revit. The findings revealed that BIM process optimization significantly reduced accidents due to fall hazards, electrocution, caught-in or between objects, fire hazards, slips, trips, and falls. The BIM process was advantageous in terms of safety compared to traditional construction methods and could help stakeholders address safety issues, clashes, project cost, and scheduling concerns.



18:50 GALA DINNER/AWARDS CEREMONY/SHOW - Marika A Ballroom